🔹 Basic Info.
Control Mode
Collective Selective Control
Elevator Door
Center Opening Door
Application
Hotel, Apartment, Office Building
Traction Machine
Gearless Traction Machine
Control System
Monarch Vvvf Controller
Material
Mirror Etching Panel
📦 Product Description
Passenger Elevator
Passenger Elevators: Designed for high-rise buildings, offering smooth, quiet rides, high energy efficiency, and fully customizable cabins to suit modern architecture.
Observation Home Elevator
Observation Home Elevator
Observation Home Elevator
Small Machine Room Sketch & Installation
✔️1. Approved drawings guide installation, meeting international elevator standards.
✔️2. Ensure >50mm step and proper width for machine room to well holes.
✔️3. Step between decor and door sill to prevent water entry post-installation.
✔️4. Watering objects must meet graphic standards during installation.
✔️5. Create buffer base under installer guidance.
| Load (kg) |
Speed (m/s) |
Hoistway Size (mm) |
Machine Room Size (mm) |
Car Dimension (mm) |
Door Opening (mm) |
Overhead (mm) |
Pit Depth (mm) |
| 630 |
1.0 |
2000×1800 |
2000×3500 |
1400×1100 |
800 |
4500 |
1500 |
| 1.5 |
4600 |
1600 |
| 1.75 |
4700 |
1700 |
| 2.0 |
4900 |
2000 |
Note: Only for reference, final manufacture please follow contract.
🛠️ After Sales Service
Standard Warranty: 12 months post-assembly (excludes transportation fees).
Global Support: 24/7 technical assistance and ready availability of spare parts.
Training: Comprehensive on-site or remote operation and maintenance training.
🏢 Industrial Profile
As a leading elevator manufacturer, we hold ISO 9001 and CE certifications. Our products are exported to over 10 countries, backed by strong R&D and quality assurance protocols.
Why Choose Us?
- OEM/ODM capabilities
- Competitive pricing & bulk discounts
- Fast shipping & customs clearance
- Turnkey project solutions
Other Products
- Home elevators
- Freight elevators
- Sightseeing elevators
- Specialty lifts
❓ Frequently Asked Questions
⭐ How to handle installation post-purchase?
Manuals and drawings are provided. You can hire local teams; our engineers offer remote guidance throughout the process.
⭐ How is damage risk during sea freight managed?
We use reinforced wooden crates and anti-rust packaging. Full insurance is included under CIF terms to protect your investment.
⭐ What is the timeline for a customized elevator?
1. Design: Proposal in 3 days after hoist-way details are submitted. 2. Production: Commences post-deposit. 3. Delivery: Typically ships 15 days after the final balance.
⭐ What are the payment terms?
We offer flexible and secure options. Standard terms include a 30% deposit to start production and the 70% balance due post-production and pre-shipment via T/T.
⭐ What additional costs are included in the quote?
Depending on Incoterms (e.g., FOB or CIF), the quote includes the product cost, professional export packaging, sea freight, and insurance. Local import duties and installation labor are handled by the buyer.